Power Pole Preservative Fate and Transport Modelling and Risk Assessment

Power Pole Preservative Fate and Transport Modelling and Risk Assessment

Power Pole Preservative Fate and Transport Modelling and Risk Assessment ALBERTA PROJECT SUMMARY As part of their management of environmental liability, a power transmission client wanted help evaluating the fate and transport of pentachlorophenol (PCP), creosote, and...
Gas-Fired Power Plant Approval

Gas-Fired Power Plant Approval

Gas-Fired Power Plant Approval ALBERTA PROJECT SUMMARY Signalta Resources required approvals from both Alberta Environment and Parks (AEP) and the Alberta Utilities Commission in order to construct a new natural gas-fired power co-generation facility providing...
Elemental Energy Brooks Solar Project

Elemental Energy Brooks Solar Project

Elemental Energy Brooks Solar Project ALBERTA PROJECT SUMMARY Elemental Energy developed a 15 MWac solar facility in Brooks, Alberta – the first utility-scale solar project in western Canada. During a pre-construction site visit, Elemental Energy personnel noticed...
AltaLink Oldman River Bank Protection

AltaLink Oldman River Bank Protection

AltaLink Oldman River Bank Protection LETHBRIDGE, ALBERTA PROJECT SUMMARY The foundations of four AltaLink transmission structures were threatened due to significant bank erosion along a 900m reach of the Oldman River, Alberta. Further bank erosion could impact the...
Signalta Resources Power Plant Approval

Signalta Resources Power Plant Approval

Signalta Resources Power Plant Approval EAST OF RED DEER, ALBERTA PROJECT SUMMARY Signalta Resources wanted to build a new natural gas-fired power generation facility east of Red Deer. A power generation facility of this type requires approvals from both Alberta...