Featured – Water Resources Engineering & Environmental Design
Frenchman River Reconnection Project for Trout Unlimited Canada

Frenchman River Reconnection Project for Trout Unlimited Canada

PROJECT SUMMARY
As part of their Reconnecting Canada initiative, Trout Unlimited Canada (TUC) identified an opportunity to address an obstruction to fish passage in the Cypress Hills Uplands region of Southwestern Saskatchewan. The Frenchman river reconnection project aimed to solve the issue of lost connectivity that had been created by scour at the outlets of several hanging culverts within two tributaries of the Frenchman River: Caton Creek and Davis Creek. The purpose of the project was to increase available habitat for threatened Plains Sucker (formerly known as Mountain Sucker) populations, improving their ability to adapt to the growing pressures of climate change and habitat loss. Changes to water flow and fish passage are described as threats to Plains Sucker populations as is genetic fragmentation created by improperly designed or failed infrastructure. These fish play an important role in the ecosystems that they inhabit.

Drumquin Park Weir Removal and Channel Enhancements

Drumquin Park Weir Removal and Channel Enhancements

In collaboration with Enbridge and the Town of Milton, Conservation Halton undertook a priority environmental project to decommission the existing Drumquin Park weir on East Sixteen Mile Creek and restore the natural channel function and habitat. Sixteen Mile Creek provides aquatic habitat to many species including the Silver Shiner, a species classified as at risk in Canada and threatened provincially. Removal of the Drumquin weir provides the opportunity to restore connectivity to downstream occupied Silver Shiner habitat and rehabilitate degraded Silver Shiner habitat – actions that address the various recovery objectives for this threatened species.

Gas-Fired Power Plant Approval

Gas-Fired Power Plant Approval

Signalta Resources required approvals from both Alberta Environment and Parks (AEP) and the Alberta Utilities Commission in order to construct a new natural gas-fired power co-generation facility providing electricity, heat and carbon dioxide (CO2) to a neighbouring greenhouse east of Coaldale, Alberta.

City of Calgary 12 St. S.E. Bridge Replacement

City of Calgary 12 St. S.E. Bridge Replacement

The City of Calgary recently embarked on a project to replace the 109-year-old 12 Street S.E. Bridge over the Bow River, the main access point between the Calgary Zoo and locations to the south. The bridge was in poor condition and deteriorating beyond a safe, useable condition.

AltaLink Oldman River Bank Protection

AltaLink Oldman River Bank Protection

The foundations of four AltaLink transmission structures were threatened due to significant bank erosion along a 900m reach of the Oldman River, Alberta. Further bank erosion could impact the reliability of the line or require the relocation of the structures to another location.

Recent Posts

Air Quality Assessment: In Situ Thermal Oil Sands SAGD Facility

NORTHERN ALBERTAPROJECT SUMMARY An oilsands developer requested to scope a potential increase in their facility sulphur dioxide (SO2) emission limit to allow for operational flexibility. To support this regulatory amendment request, Matrix Solutions Inc. conducted...

Lithium Brine Deposit Resource and Reserve Estimate

SALAR LITHIUM BRINE PLAY – ARGENTINA, S. AMERICAPROJECT SUMMARY Our client was in the resource delineation and quantification stage of planning a lithium brine project in South America. As part of this exploration, it was recognized that hydrogeological aquifer...

Flood Mitigation Study for New Hamburg

NEW HAMBURG, ONTARIOPROJECT SUMMARY The Town of New Hamburg is located along the Nith River and is one of 27 municipal flood damage centres in the Grand River Conservation Authority’s (GRCA’s) jurisdiction. The Town was established and developed in the Nith River...

We routinely lead characterization of stream morphology to:

  • Assess fluvial erosion hazards
  • Develop alternatives for erosion control in environmental assessments
  • Develop management strategies as part of land use planning (subwatershed, secondary, tertiary plans and site plans)
  • Assist in culvert/bridge design
  • Define erosion thresholds to inform stormwater management

Learn about some of the interesting projects Matrix’s team of environmental consultants and engineers get to be a part of.

Got a specific question about a project or opportunity?

Use this form or the email address below to drop us a line and we’ll make sure it gets sent to the appropriate Matrix team.

General inquiries

Use the email below to contact our reception mailbox

Join the Matrix Team

We’re always looking for great people who share our values.

I hereby accept the terms and agreement