Spill Response
Resource Specialists Support for the Trans Mountain Expansion Project

Resource Specialists Support for the Trans Mountain Expansion Project

Matrix began supporting construction of the Trans Mountain Expansion Project (TMEP) in Spring 2019. TMEP is essentially a twinning of the existing 1,150-kilometre pipeline between Strathcona County (near Edmonton), Alberta and Burnaby, BC.

Environmental services for Keyera KAPS project

Environmental services for Keyera KAPS project

KAPS, a natural gas liquids (NGL) and condensate system, is a highly desired industry pipeline solution designed to integrate services, generate more volumes and expand commercial opportunities. All of which can benefit Alberta. KAPS creates a platform for future investment opportunities that could include additional gas and condensate processing investments, new NGL infrastructure or other value-added services

Golden Ranches conservation area: Assessment and remediation

Golden Ranches conservation area: Assessment and remediation

Alberta Conservation Association (ACA) is a non-profit organization that conserves, protects, and enhances ecological habitats for the benefit and enjoyment of the public. A land donation from a ranching family led to ACA and its partners having the opportunity to assume 1,350 acres of valuable grassland, aspen forest, and lake shoreline in the Beaver Hills UNESCO Biosphere Reserve east of Edmonton, Alberta. Golden Ranches provides important habitat for upland birds, waterfowl, white-tailed deer, and moose.

Spill Response and Remediation Program Management

Spill Response and Remediation Program Management

Murphy Oil Corporation discovered a condensate release from one of its pipelines at three separate surface locations in April 2015. Our client needed to delineate and contain the spill. Monitoring of wildlife, surface water, groundwater, and atmosphere quality was required to assess for impacts from the release. Once containment was put in place, Murphy needed to remediate and manage risks associated with the spill.

Natural Gas Pipeline Release

Natural Gas Pipeline Release

One of our pipeline clients discovered a pin hole in one of their pipelines that was leaking natural gas and liquids into the soil. Our client needed to understand the extent of the contamination, and most importantly, prevent the contamination from spreading to domestic water wells and the nearby river.

Recent Posts

Jack Tennant Memorial Bridge Fish Habitat Offsetting

CALGARY, ALBERTAPROJECT SUMMARY The Jack Tennant Memorial Bridge Fish Habitat Offsetting Project was required by Fisheries and Oceans Canada to offset the impact on fish and fish habitat resulting from the temporary instream bridge berm installed for the Jack Tennant...

Strathcona Berm Stabilization Project

VULCAN COUNTY, ALBERTAPROJECT SUMMARY The Project is located near the City of Edmonton in Strathcona County. A front‑end engineering design study was completed by the client to determine the stability of the slopes adjacent to the site as well as identifying other...

We routinely lead characterization of stream morphology to:

  • Assess fluvial erosion hazards
  • Develop alternatives for erosion control in environmental assessments
  • Develop management strategies as part of land use planning (subwatershed, secondary, tertiary plans and site plans)
  • Assist in culvert/bridge design
  • Define erosion thresholds to inform stormwater management

Learn about some of the interesting projects Matrix’s team of environmental consultants and engineers get to be a part of.

Got a specific question about a project or opportunity?

Use this form or the email address below to drop us a line and we’ll make sure it gets sent to the appropriate Matrix team.

General inquiries

Use the email below to contact our reception mailbox

Join the Matrix Team

We’re always looking for great people who share our values.

I hereby accept the terms and agreement